| |
|
||||||||||||
| |
|
||||||||||||
| |
|||||||||||||
| |
|||||||||||||
| |
|||||||||||||
| |
|
|
|||||||||||
![]() |
|
![]() |
|||||||||||
| |
|
|
|
|
|
||||||||
| |
|||||||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|||||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
|
|
|
|
|
|
||
| |
|
|
|
|
|
||||||||
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
In the current marketplace, construction material rates are constantly fluctuating. Items such as copper, steel, and concrete tend to be highly inflated. Nationally, there is also a large problem with construction bids significantly exceeding the project allocation. As a result, both labor and material rates need to be monitored continuously to ensure accuracy in cost estimating and cost engineering. CRAWFORD'S extensive market research and studies are conducted on all commercial and federal projects and consists of contacting local suppliers, construction trades, specialty contractors, area-specific local union halls for labor/material availability and rates within each locality.

VA Pittsburgh Healthcare System,
Heinz Division (Aspinwall) Villas – Pittsburgh, PA
(Currently Under Construction)

VA Pittsburgh Healthcare System,
Heinz Division (Aspinwall) Administration Building – Pittsburgh, PA
(Currently Under Construction)